Installation under difficult conditions.

Installation of a 7-metre logo for General Electric (Switzerland) GmbH.

Real professionals do not shy away from working in rain and hail:

The specialists from Frontwork installed the new GE logo where the 38 metre wide illuminated Alstom sign had been located under difficult weather conditions. They used the existing anchorage points of the industrial building and bolted new suspension brackets to the Welleternit façade.

The base consists of welded aluminium sections and a circular cover of lacquered aluminium sheet mounted on top. The white LED illuminated logo elements are mounted on this in the form of illuminated letters. The light can be dimmed from anywhere with a wireless remote-control unit. The installation weighed 980 kg and was assembled on site on the ground. The specialists from Frontwork used a mobile crane to lift the logo to its final destination.

Ein plötzliches, heftiges Gewitter unterbrach die heiklen Montagearbeiten auf dem Skyworker. Nachdem sich die Naturgewalten am nächsten Tag wieder beruhigt hatten, konnte Frontwork die Arbeit zu Ende führen.